|
Author |
Thread Statistics | Show CCP posts - 0 post(s) |
Alaika Arbosa
Matari Combat Research and Manufacture Inc. Zombie Ninja Space Bears
47
|
Posted - 2013.01.13 23:30:00 -
[1] - Quote
I have never once heard/read anything from CCP saying that they did not like the idea of BPOs outside of the T2 BPOs. I would imagine that they will be including them (non-T2 BPOs for all items available for ISK) and if they don't; well, there goes the player-driven market. Everything will need to be bought from NPCs and that is something I see as being less likely than the inclusion of BPOs for all items currently available on the market for ISK.
Now, keep in mind, I would imagine that these BPOs would be the same as those found in Eve-- a recipe for the creation of items, not the free item we fit to our dropsuits as they are now. |
Alaika Arbosa
Matari Combat Research and Manufacture Inc. Zombie Ninja Space Bears
47
|
Posted - 2013.02.09 17:37:00 -
[2] - Quote
Auztin Dorriety wrote:They could make it material based by making it where instead of infinite use,you just have blueprints & have to gather the materials to build it every time you lose an outfit or buy the materials similar to DC Universe Online's R&D setup.
They need to just give us a Bill of Materials for each BPO as well as some access to Manufacturing lines of some sort and be done with it. Give us some form of PVE to gather the materials or make it so that we can buy the materials off of the market too. BPOs should be a better option than actually buying the gear from the market, though they shouldn't be the free ad infinitum items they currently are. |
Alaika Arbosa
Matari Combat Research and Manufacture Inc. Zombie Ninja Space Bears
47
|
Posted - 2013.02.09 18:41:00 -
[3] - Quote
Omnipotent Zitro wrote:No.
All CCP needs to do is make the bigger tiers better to use.(aka, advance and prototype gear)
Because as of right now I have absolutely no reason to use more expensive gear when it hardly makes a difference.
Yeah, they need to do this too, though I would assume that eventually we will have BPOs for all dropsuits/equipment/modules/vehicles/weapons available from the market. In order for that to work, we need a Bill of Materials for each BPO as well as access to manufacturing lines to make them. |
|
|
|